
FRONT LINKS
GROUNDST
ACK
SPLAY
LIN
K
GROUNDST
ACK
FRONT LINK
ST
ORAG
E
LOCK
6°
4°
2°
0°
- 2°
- 4°
- 6°
C-AF CORA
ARRA
Y FRAME -
We
ight 27 kg
Engineered and manufactured in the UK
ST
ORAG
E
FRONT LINKS
FRONT LINKS
FRONT LINKS
FRON
T
LINKS
Manchester - England
Version 7.0 01/02/2019
18
4.5. CORA-S
Prepare the
fi
rst cabinets rigging hardware (as described in chapter 4.2. CORA
Array Rigging Mechanism). Lower the frame onto the cabinet until the front and rear
sub steel links line up with the
fl
ying link holes on the frame and insert the locking
pins from the cabinet on each side.
Add further cabinets using the same procedure as above. Raise the frame with the
fi
rst cabinet attached and then lower onto the next cabinet and repeat the process.
Connect the speaker lines according to the number of ampli
fi
er channels and
cabinets used.
CORA-S shares the same symmetrical footprint whether the cabinet is front facing or
rear facing. No adjustment to the cabinet rigging is required for mixed front facing/
rear facing set-ups. Cardioid sub arrangements can be deployed easily with this in
mind. The cabinet is also
fi
tted with speakON
®
connectors front and back for ease of
cable management.
Before you start prepare the sub links
and
fi
t to the top of the CORA-S.
Lower the frame using the hoist over
the
fi
rst CORA-S.
Remove the pins from the top of the
sub links on the CORA-S if not already
done so.
Lower the frame onto the sub links
and line up the holes.
Once in position replace the pins
through the frame and the sub links.
1
3
2
4