
FRONT LINKS
GROUNDST
ACK
SPL
AY
LIN
K
GROUNDST
ACK
FRONT LINK
ST
ORAG
E
LOCK
6°
4°
2°
0°
- 2°
- 4°
- 6°
C-AF CORA
ARRA
Y FRAME -
We
ight 27 kg
Engineered and manufactured in the UK
ST
ORAG
E
Manchester - England
Version 7.0 01/02/2019
19
Add additional subs as follows
Position the frame and CORA-S using
the hoist over the additional CORA-S.
Remove the pins from the top of the
sub links on the lower CORA-S if not
already done so.
Lower the array onto the sub links and
line up the holes.
Once in position replace the pins
through the CORA-S rigging and the
sub links.
5
6
7
8