Effective 11/2010
2
The crate should be opened and inspected immediately upon delivery. Unpack the
unit at once and perform a visual inspection to determine if it is dented, bent or scratched.
Also check to make sure the power cord is attached and that the control panel has not been
damaged in any way during shipment.
If for any reason the unit should need to be returned in the future, the original
crate is the best way to ship it back to the manufacturer. Claims of damage due to freight
handling can only be filed by you, the consignee, as
OGSI
shipping terms are Free On
Board (FOB), North Tonawanda, NY USA. This means that once the equipment leaves
our dock you are the owner of it.
OGSI
has no legal claim to make against any shipping
company for damage.
At
OGSI
, we are committed to using shipping companies with good reputations
for taking care in the handling of freight and providing service in the event of damage.
Initial Inspection
Summary of Contents for MOGS - 100
Page 2: ......
Page 6: ......
Page 50: ...Effective 11 2010 44 MOGS 100 Filling Manifold Design Installation Optional...
Page 58: ......
Page 59: ...Appendix...
Page 60: ......