FIG. 47
Begin routing the
Pec Dec Cable (#39)
through the Nylon
Pulley 4 1/2 Rd. (#64-Labeled S), then up and over the Nylon Pulley 4 1/2
Rd. (#64-Labeled T) located on the
Closed-End Double Pulley Bracket
(#26)
, then down and under the Nylon Pulley 4 1/2 Rd. (#64-Labeled U).
Finally, route the end of the
Pec Dec Cable (#39)
to the
Right Pec Dec
Arm (#6)
. Use the same hardware and procedure that was used for the
Left Pec Dec Arm (#7)
as described in
Fig. 46
.
Note
: Refer to the Cable Mapping Diagram on page 23 for further
detailed illustration of the
Pec Dec Cable (#39)
routing.
FIG. 48
Locate the
Tension Cable (#40)
and attach it to the pulley
bracket located on the
Base Frame (#2)
. Secure the cable into place
using one Hex Head Cap Screw 3/8-16 X 1 3/4 (#93), two Flat Washers
SAE 3/8” (#71), two Nylon Spacers 3/8 X 3/8 (#104) and one Nylon Insert
Jam Lock Nut 3/8-16 (#82). Refer to
Fig. B
on page 24 for further
clarification of this hardware assembly.
Note
: Refer to the Cable Mapping Diagram on page 24 for further
detailed illustration of the
Tension Cable (#40)
routing.
FIG. 49
Route the
Tension Cable (#40)
up and over the Nylon Pulley
4 1/2 Rd. (#64-Labeled V) located on the
Closed-End Pulley Bracket
(#26)
.
Note
: Refer to the Cable Mapping Diagram on page 24 for further
detailed illustration of the
Tension Cable (#40)
routing.
FIG. 50
Continue to route the
Tension Cable (#40)
down and under
the Nylon Pulley 4 1/2 Rd. (#64-Labeled W), as shown above.
Note
: Refer to the Cable Mapping Diagram on page 24 for further
detailed illustration of the
Tension Cable (#40)
routing.
ODY-5 Odyssey Home Gym
14
Owner’s Manual: Assembly Instructions
Summary of Contents for ODY-5
Page 24: ...CABLE MAPPING DIAGRAM FOR Pec Dec Cable 39 FIG A 23 ODY 5 Odyssey Home Gym ...
Page 25: ...CABLE MAPPING DIAGRAM FOR Tension Cable 40 FIG B FIG A ODY 5 Odyssey Home Gym 24 ...
Page 28: ...FIG 67 FIG 68 FIG 69 FIG 70 FIG 71 27 ODY 5 Odyssey Home Gym ...