EX Series Operating Manual
Measuring Point.
If you want to acquire the accurate data and result about the power suppyl's load regulation
measuring, pk-pk Voltage and response time, you must connect the load resistor to A point
of figure. 4-3 and you must connect the measuring instrument at the B point of fighre.4-3
(V-Sensign connecting hole)
(V-Sensign connecting hole)
< Figure. 4-3 >
Rear Panel Terminal Connections(Side view)
5-5. Using Front Panel Calibration.
Below structure is the procedure of using front panel "CALIBRATE Key"
Calibration Key Structure
- 68 -