982017-AIR-BASIC-Multitower-T201-EN01.docx
Page 20 of 60
Figure 20:
Removing the hydraulic hoses
-
Remove the 4 hydraulic hoses and the thermal
insulation element.
Figure 21:
Undoing the connecting screws
-
Undo the 4 screws on the tabs at the front of
the appliance.
Figure 22:
Separating the appliance sections 1
-
Pull the top section towards the front.
Figure 23:
Separating the appliance sections 2
-
Tilt the top section towards the back. Use the
grip rail for better grip during transport.
Figure 24:
Setting down the T201 top section
-
Set the top appliance section on a pad or mat
to avoid damage.
Assembling the appliance sections:
Assemble the appliance sections in reverse order.
The positioning aids and dotted line markings
facilitate sliding the top appliance section into
the guide on the lower section.
Summary of Contents for AIR BASIC 211 T201
Page 50: ...982017 AIR BASIC Multitower T201 EN01 docx Page 50 of 60 11 8 Declaration of conformity...
Page 51: ...982017 AIR BASIC Multitower T201 EN01 docx Page 51 of 60...
Page 52: ...982017 AIR BASIC Multitower T201 EN01 docx Page 52 of 60...
Page 53: ...982017 AIR BASIC Multitower T201 EN01 docx Page 53 of 60...
Page 54: ...982017 AIR BASIC Multitower T201 EN01 docx Page 54 of 60 11 9 ERP Data...
Page 55: ...982017 AIR BASIC Multitower T201 EN01 docx Page 55 of 60...
Page 57: ...982017 AIR BASIC Multitower T201 EN01 docx Page 57 of 60...
Page 58: ...982017 AIR BASIC Multitower T201 EN01 docx Page 58 of 60...
Page 59: ...982017 AIR BASIC Multitower T201 EN01 docx Page 59 of 60...