![OBO Bettermann EI30 Mounting Instructions Download Page 50](http://html1.mh-extra.com/html/obo-bettermann/ei30/ei30_mounting-instructions_3169658050.webp)
50 | EN
OBO Bettermann
Mounting PYROLINE® Con S PLC with a support system
Pre-drilling wall connection collar
Note!
For simpler mounting of the wall connection collar, pre-drill the drill holes
before mounting.
y
x
z
Fig 45:
Position of drilling holes for PLCS... wall connection collar
Duct type
x
y
z
PLCS D060810
45 mm
45 mm
66 mm
PLCS D061220
45 mm
45 mm
116 mm
PLCS D090810
75 mm
75 mm
–
PLCS D091220
50 mm
70 mm
106 mm
Summary of Contents for EI30
Page 63: ...EN 63 Notes...