39 | EN
Mounting instructions, PYROLINE
®
Con PLC fire protection duct
Mounting PYROLINE® Con S PLC with a support system
8 2
Mounting the suspended support and bracket
Fig 32:
≤ 700 mm
≤ 200 mm
≤ 1000 m
m
Suspended support and bracket mounting under the ceiling
1. Have the right suspended support and bracket to hand. The bracket
must be sufficiently long for the fire protection duct to be supported
over its full area.
2. Draw the drill holes for suspended supports:
– A maximum of 200 mm away from the wall for the first suspend-
ed support.
– 900 mm away from the wall for the second suspended support.
– 1,000 mm spacing between all further suspended supports.
Note!
The data relates to a complete duct length. If the fire protection duct is
shortened, adjust the spacing of the second suspended support accord-
ingly.
3. Drill the drill holes.
4. Mount the suspended supports with bolt ties.
5. Mount the bracket on suspended supports with spacers and hexagon-
al bolts.
Summary of Contents for EI30
Page 63: ...EN 63 Notes...