Section 7: Installation
26
6. Remove the dummy unit from the wall hanger and place it out of the way. Completely
assemble a NNEBFEZ to the
refrigerated side first (Refer to pages 10-17)
.
Assembled
NNEBFEZ on
refrigerated unit
Dummy unit
hanging bracket.
Do not remove
Note:
The fountain frame may be secured by two anchors at the lower corners.
Remove the anchors and set aside until the unit is ready to be reinstalled to the wall.
Follow all steps on page 14 with the provided drain supplies, but do not connect to the
P-trap or other existing pipes.
Summary of Contents for NNEBFEZ
Page 3: ...NNEBFEZ Section 2 Rough In Drawing 3...
Page 4: ...SINGLE LEVEL PREPARATION 4 Disassembly of ELKAY Cooler Wiring Water Lines...
Page 9: ...9 SINGLE LEVEL INSTALLATION Assembly of NNEBFEZ Cabinet Wiring Plumbing...
Page 21: ...21 SPLIT LEVEL INSTALLATION Assembly of Split Level NNEBFEZ Cabinet Wiring Plumbing...
Page 35: ...35...