Section 3: Preparation
5
1. Remove fountain wrapper.
Remove 4x
#10 Hex
Screws
2. Turn OFF water supply to the unit.
Bleed any remaining pressure from the
lines by activating the bubbler valve.
3. Disconnect power by UNPLUGGING
the unit from the wall socket.
4. Loosen or remove the P-trap so that the fountain nose assembly may be freely
removed in the next step.
Loosen or
Remove
Summary of Contents for NNEBFEZ
Page 3: ...NNEBFEZ Section 2 Rough In Drawing 3...
Page 4: ...SINGLE LEVEL PREPARATION 4 Disassembly of ELKAY Cooler Wiring Water Lines...
Page 9: ...9 SINGLE LEVEL INSTALLATION Assembly of NNEBFEZ Cabinet Wiring Plumbing...
Page 21: ...21 SPLIT LEVEL INSTALLATION Assembly of Split Level NNEBFEZ Cabinet Wiring Plumbing...
Page 35: ...35...