Section 4: Installation
19
15. Install the provided strain relief P-Clip to the power cord roughly 36” from the grounded
plug. Attach it to the back side flange of the fountain frame with a #8 Torx screw.
(Figure 14a)
16. Attach the ring terminal to the ground screw on the left side of the fountain strut through
the lower flared hole using the provided #8 thread cutting hex Screw.
(Fig 15a). Do not
remove/alter the original ground.
17. Finish by plugging in the grounded plug into the duplex socket.
Fig. 14a
Fig. 15a
Second IEC connector
will not be used in a
single level unit.
Grounded Plug
IEC to Power Brick