![NUVE NC 23B User Manual Download Page 30](http://html1.mh-extra.com/html/nuve/nc-23b/nc-23b_user-manual_1719826030.webp)
30
second character. The second character is written by pushing value increase (F1) and
decrease keys (F2) and tab key (F3) is pushed to enter the next character. After all characters
are written completely in this way, push the enter key (F4) to enter the mail server. After
mail server is written in the same way, push the enter key (F4) to write next e-mail address.
After all e-mail addresses from 1 to 5 are written as mentioned above, push enter key (F4)
and return to main page.
Tab key (F3) is used for changeover from one character of address to another.
7.4.
C/BAR
“
°C / Bar
” menu is selected from the main menu by using left (F1) and right (F2) keys. Push
enter (F4) key to monitor temperature and pressure sensor values which are placed in the
different parts of the sterilizer. Back key (F3) is used to exit the screen. You may also access this
page by using “
°C / Bar
” (F3) key on working screen.
7.5.
SERVICE
“Service” menu is selected from the main menu by using left (F1) and right (F2) keys nad push
enter (F4) key to access. Service menu is password protected and it is for authorized technical
staff.
8.
PERIODIC MAINTENANCE AND CLEANING
8.1.
PERIODIC MAINTENANCE
Cleaning and periodical maintenance operations should be performed the
manometer pressure is 0 bar, the lid is open position and the chamber is cold. During
cleaning and maintenance operation, remove the plug from the outlet.
Security valves which are in direct contact with pressure shall be replaced in every 5 years by
authorized personnel.
After each 2000 runs the instrument should be controlled by authorized technical service
personnel.
The door gasket shall be replaced by the authorized personnel after each 500 cycles or in
every six months.
The air filter shall be replaced after in every 300 cycles.
It is recommended that the Bowie&Dick/Helix Test shall be performed weekly, while the
Vacuum Test shall be executed at the beginning of every working day while the chamber is
not yet heated; to assure efficient functioning of the unit.
8.2.
PERIODIC CONTROL
The service technician shall perform the following preliminary checks before operating the
autoclave.