Operating Manual and Inspection Book
POWER LIFT HL 2.30 NT / HL 2.35 NT / HL 2.40 NT
20100016 OPI
- 5 -
Version 1.1
After successful set up, complete this form fully, sign it, make a copy and send the original to the
manufacturer within a week. The copy remains in the inspection book.
Otto Nußbaum GmbH & Co. KG
Korker Straße 24
D-77694 Kehl-Bodersweier
Assembly protocol
The lift................................................................
with serial number..............................................
was set up on (date)..............................
at (company name)............................................
in (town, city).........................................
checked for function and safety and put into operation.
The set up was done by the operating company / specialist (score out the one that does not
apply).
After successful inspection of function and safety by a trained assembler, the lift is transferred
without electrical connection (e.g. plug) to on-site power supply. An on-site electrical connection
between the lift and the power supply is to be done by a qualified electrician. (See details in the
electrical plan).
The operating company confirms proper lift set up, has read and will comply with all information
contained in this operating manual and inspection book, and will keep this document accessible
to trained operators at all times.
The specialist confirms proper lift set up, has read all information in this operating manual and
inspection book, and has transferred the documents to the operating company.
Anchor used (
*)
: ___________________________________ (Type/ brand)
Minimum anchoring depth (
*)
complied with: _____________ mm
ok
Tightening torque (
*)
complied with: ____________________ NM
ok
.........................................
..................................................
..............................................
Date
Name, operating company
Operating company signature
& company stamp
.........................................
.................................................
..............................................
Date
Name, specialist
Signature of specialist
Service partner: ........................................................................................................... (Stamp)
(*) See enclosed anchor manufacturer sheet
Lift update 04/2013 // Operating Manual update 08.08.2013
Summary of Contents for HL 2.30 NT
Page 2: ......
Page 94: ...Notes ...