Operating Manual and Inspection Book
POWER LIFT HL 2.30 NT / HL 2.35 NT / HL 2.40 NT
20100016 OPI
- 35 -
Version 1.1
7.1 Maintenance plan
Before beginning service, disconnect from power. The work area around the lift is
to be secured against unauthorized use.
Type of maintenance
Maintenance plan
Time frame
Model and information signs, labels, brief operating
instructions, safety stickers and warning information
are to be cleaned and exchanged if damaged.
Daily
Check the lifting arm block and gear for wear.
Exchange if there is visible damage.
At least 1 x
per year
Lifting arm booms, lifting arm bolts, carrier plate
threaded bolts are to be checked for ease of running.
If required, lightly grease with a multi-purpose
grease. Do not over-lubricate.
At least 1 x
per year
Check the foot bumper for condition and function.
Exchange if damaged.
Daily
The rubber acceptance plate is to be checked for
wear and replaced if necessary.
Daily
Check the tracks and the lift rail equalization parts for
wear. After cleaning, grease with a multi-purpose
grease. We exclusively recommend that MO-2 high
performance lubricating grease is used. (available for
purchase directly from Oest)
Every 3 months
The lift cylinder can sweat and small oil droplets can
form on the base plate, this is however, not a leak.
Clean as
required
Visual
inspection
Spray
Oil
Lubricate
Clean with
compressed air
Clean
Inspect
Summary of Contents for HL 2.30 NT
Page 2: ......
Page 94: ...Notes ...