OM0283
Page 52 of 70
Rev 2 July/2021
7.10 Main Control Board Description and Replacement
To access the main control board for fuse or board replacement, remove screws at each upper side of the control center
and allow the control center to rotate down, resting on the safety straps. Now the main control board is exposed for
service.
7.10.1 Main Control Board Replacement
The main control board consists of one Printed Circuit Board (PCB) assembly.
The PCB contains the power supply, configuration switch, sensor inputs/outputs and control inputs/outputs
components and display.
7.10.2 Main Control Board Fuse Replacement
Disconnect electrical power from cabinet before fuse replacement.
All AC circuits are fuse protected and when replacement is necessary, USE ONLY FUSES OF SAME TYPE AND RATING
FOR PROTECTION AGAINST RISK OF FIRE.
DESCRIPTION:
BLOWER FUSE
OUTLET FUSE
ACCESSORY
OUTPUT FUSE
LIGHT FUSE
FUSE TYPE:
TIME-LAG
TIME-LAG
TIME-LAG
TIME-LAG
FUSE SIZE:
1/4 X 1-1/4 INCH
5 X 20MM
5 X 20MM
5 X 20MM
NU-543-300
10 AMPS
3 AMPS (2)
2 AMPS
1 AMP (2)
NU-543-400
12 AMPS
3 AMPS (2)
2 AMPS
1 AMP (2)
NU-543-500
15 AMPS
3 AMPS (2)
2 AMPS
1 AMP (2)
NU-543-600
15 AMPS
3 AMPS (2)
2 AMPS
1 AMP (2)
7.10.3 Main Control Board Replacement
Note: All setup and calibration data will be lost, the memory reinitialized to the default values and all control
functions reset to an initial cabinet power condition.
If possible, before the main control board replacement, it would be preferred to know the operational
parameters of the cabinet, (i.e. blower speed/PWM signal DC voltage setpoints if modified and airflow data
from previous certification).
Disconnect electrical power from the cabinet before attempting any
maintenance action.
The main control board is fastened to the control center with (6) 6-32 studs/nuts. All electrical connections are
made with removable terminals and/or Faston connectors except for the motor/blower connector which uses a
screw terminal. Remove all electrical connections and fasteners and then remove the main control board from the
control center.
Install new main control board by reattaching all electrical connections and fasteners. Once installed, rotate
control center to normal position and fasten in place.
Reconnect power to cabinet.
CAUTION
!
CAUTION
!
Summary of Contents for LabGard D NU-543-400
Page 7: ...OM0283 Page 7 of 70 Rev 2 July 2021 ...
Page 9: ...OM0283 Page 9 of 70 Rev 2 July 2021 ...
Page 10: ...OM0283 Page 10 of 70 Rev 2 July 2021 ...
Page 11: ...OM0283 Page 11 of 70 Rev 2 July 2021 ...
Page 12: ...OM0283 Page 12 of 70 Rev 2 July 2021 ...
Page 16: ...OM0283 Page 16 of 70 Rev 2 July 2021 ...
Page 21: ...OM0283 Page 21 of 70 Rev 2 July 2021 ...
Page 34: ...OM0283 Page 34 of 70 Rev 2 July 2021 ...
Page 65: ...OM0283 Page 65 of 70 Rev 2 July 2021 ...
Page 66: ...OM0283 Page 66 of 70 Rev 2 July 2021 ...
Page 67: ...OM0283 Page 67 of 70 Rev 2 July 2021 ...
Page 68: ...OM0283 Page 68 of 70 Rev 2 July 2021 ...