2. Specification
— 2-4 —
2.2.2.1. CN2 Pin-Out
Figure 2-3 below shows the shipping set of the pin-out arrangement of the CN2 connector.
You may change the function assignment of each signal port.
(Except some ports that are dedicated to a certain function)
◊
Change to an extended capability port.
◊
Transfer an assigned function to other port.
◊
Mask the function of unused port.
The each port of the CN2 connector is assigned to the same port name as the remote
Input/Output of the CN6 interface connector, and the ports of both connectors are corresponsing
each other.
!
Caution : A change of function assignment of a port of the CN2 connector forces the
function change to the remote Output/Input of the corresponding port.
Fig. 2.3: CN2 pin-out
1
DC24
6
PI3
(OTM)
2
-
7
-
3
PI0
EMST
8
PO0
(DRDY)
4
PI1
(ACLR)
9
-
5
PI2
(OTP)
10
COM
Note: Functions in brackets is the shipping set.
: The pins with hyphones “-“ are prophibited
connection.
EMST: Emargency stop
Input dedicated to the safety functions
DRDY: Driver Unit ready
NRM
:
Normal
Output dedicated to the safety functions
EMST : Emergency stop
ACLR : Alarm clear
OTP : Travel limit, + direction
OTM : Travel limit, - direction
SVON : Servo ON
RUN : Positioning start
STP : Stop
PRG0 - 7 : Internal program chanel
selection 0 to 7
JOG :
Jogging
DIR :
Jogging
direction
HLD :
Hold
ORD :
Velocity
override
IOFF :
Integration
OFF
HOS : Home Return start
HLS : Home position limit
General Input
PI0 and PO0 ports are dedicated to the safety function Input and Output. They have following
restrictions respectively.
◊
You cannot change the function of the port PI0 (Pin number 3: Input EMST
(Emergency stop)). You may only set the input port and the stability timer to it.
◊
You can only exchange the function of the PO0(Pin number 8: Output DRDY (Drive
Unit ready) with the function Output NRM (Normal). You cannot set the output logic
and the stability timer to it.
Summary of Contents for MEGATORQUE MOTOR SYSTEM
Page 4: ... ii Blank Page ...
Page 6: ...1 Introduction 1 2 Blank Page ...
Page 20: ...2 Specification 2 14 Blank Page ...
Page 40: ...3 Operation 3 20 Blank Page ...
Page 44: ......