
-
79
-
GENERAL MAINTENANCE
DETERMINING REPLACEMENT OR BUILD UP
STEP 6a
Close the processor jaws until the side of the piercing tip (DA) is next to the guide
blade (DF). Measure the clearance and add shims to achieve a clearance (d64) of
.005”
(.127 mm)
, see Fig. D.
Fig. D
Apply thread adhesive to the socket head cap screws for the guide blade. Then torque
to NPK specifications (see
“FASTENER TORQUE CHART”
).
STEP 7a
After completing all welding maintenance, allow the jaw (BD) to cool slowly.
Summary of Contents for M20C
Page 23: ... 23 SERIAL NUMBER LOCATION M20 ...
Page 24: ... 24 SERIAL NUMBER LOCATION M28 ...
Page 25: ... 25 SERIAL NUMBER LOCATION M38 ...
Page 149: ... 149 WARRANTY STATEMENTS ...
Page 150: ... 150 WARRANTY STATEMENTS ...