-
74
-
REASSEMBLY OF THE HAMMER
12. Install the tool holder and tie rods.
a. Check the threads in the tool
holder.
b. Apply anti-seize compound to the
threads of the tie rods.
c. Hoist the tool holder by a crane
(t34), using slings or a hammer
hook (t28), and install it onto the
spacer section with the retaining
pin plug (I) facing upward as
shown.
d. Install tie rods (Q) into the body
from gas head end using a hand
wrench (t6).
The tool holder must be level and square to the main body. Do not
use an air wrench to thread the tie rods into the bottom nuts.
ATTENTION