
OAM&P description
6-5
Planning Guide NT6Q92MA Rel 1.0 Iss 1 Standard September 2006
By default, the facility is Admin down. When a cross-connect is provisioned
with a PDH/DSn facility, its Admin status is automatically changed to Admin
Up. When you change a facility from Admin Up to the Admin Down state, the
following occurs:
•
STM facility
— traffic will not be carried on the port
— Tx laser is shut off
— alarms present on the port are cleared
— alarm conditions are not declared
— performance monitoring is terminated
— DCC will be disabled
•
E1/E3/DS1/DS3 facility
— traffic will not be carried on the port
— alarms present on the port are cleared
— alarm conditions are not declared
— performance monitoring is terminated
•
10/100BT Ethernet facility
— traffic will not be carried on the port
— Client Signal Fail will be sent on the WAN facility
— alarms present on the port are cleared
— alarm conditions are not declared
— performance monitoring is terminated
•
Gigabit Ethernet facility
— traffic will not be carried on the port
— Tx laser is shut off
— Client Signal Fail will be sent on the WAN facility
— alarms present on the port are cleared
— alarm conditions are not declared
— performance monitoring is terminated
Note:
The WAN state follows the state of the associated 10/100BT
Ethernet or Gigabit Ethernet port. If a 10/100BT Ethernet or Gigabit
Ethernet facility is placed in admin down state, the corresponding WAN
state will automatically be placed to admin down.
Summary of Contents for Optical Multiservice Edge 6130
Page 291: ......