Connecting the server to power
Standard 1.06
62
CallPilot
In rack-mount server installations, ensure the CallPilot server
chassis and equipment racks are isolated from other foreign sources
of ground. Acceptable isolation methods include: isolation pads,
grommeted washers, chassis side-rail strips, and nonconducting
washers.
In rack-mount server installations where other equipment is also
installed in the same rack, ensure that all equipment derives ground
from the same service panel as CallPilot and the switch.
Summary of Contents for CallPilot 1005r
Page 6: ...Standard 1 06 6 CallPilot ...
Page 8: ...8 CallPilot Publication history Standard 1 06 ...
Page 10: ...Task List Standard 1 06 10 CallPilot ...
Page 12: ...Contents Standard 1 06 12 CallPilot ...
Page 34: ...1005r server description Standard 1 06 34 CallPilot ...
Page 58: ...Installing the server and peripheral devices Standard 1 06 58 CallPilot ...
Page 72: ...Index Standard 1 06 72 CallPilot ...
Page 73: ......