December 2006
Connecting the server to power
1005r Server Hardware Installation
63
Connecting the server to power
Before you begin
Ensure that proper power and grounding are available for all the power
outlets serving the CallPilot server and its associated peripherals. Power
for these devices must be wired and fused independently of all other
receptacles, and referenced to the same ground as the PBX system.
A qualified electrician must implement the single-point ground reference
as required between the power outlets of the CallPilot server and the
power outlets of the switch.
Provide a sufficient number of properly grounded power outlets or
power bars for all equipment. For more information, refer to grounding
and power requirements in this document and in the
Planning and
Engineering Guide
(555-7101-101).
The single-point ground (SPG) required by the system can be an isolated
ground (IG) bus or AC equipment ground (ACEG) bus in the service
panel or transformer. The system must be connected to safety ground or
protective earth in accordance with NEC requirements. For international
use, the system must be connected to safety ground/protective earth in
accordance with Paragraph 2.5 of EN60950/IEC950.
Note: See
Large System: Planning and Engineering
(553-3021-120) for
a complete description of approved ground sources and methods.
Insulated ground wire must be used for system grounding.
Before you connect the server to the power source, review the following
diagram to ensure that all peripheral hardware devices are in place.
Summary of Contents for CallPilot 1005r
Page 6: ...Standard 1 06 6 CallPilot ...
Page 8: ...8 CallPilot Publication history Standard 1 06 ...
Page 10: ...Task List Standard 1 06 10 CallPilot ...
Page 12: ...Contents Standard 1 06 12 CallPilot ...
Page 34: ...1005r server description Standard 1 06 34 CallPilot ...
Page 58: ...Installing the server and peripheral devices Standard 1 06 58 CallPilot ...
Page 72: ...Index Standard 1 06 72 CallPilot ...
Page 73: ......