December 2006
Preparing for installation
1005r Server Hardware Installation
39
Unpacking the 1005r server
Introduction
Follow this procedure to unpack the server and peripherals.
To unpack the equipment
1
Open the cardboard carton containing the server.
2
Remove the server from the carton; set it on a secure surface.
3
Open the cartons containing the monitor, keyboard, mouse,
modem, and ELAN hub (if supplied), and set the peripherals aside.
4
Put all manuals, DVDs or CDs, operating system disks, and any
disks for peripherals in a safe place.
.
WARNING
Risk of personal injury
The 1005r CallPilot server weighs approximately 20 kg (44 lb)
when it is shipped from manufacturing. To prevent personal
injury, have someone help you to unpack and position the
server.
ATTENTION
As you unpack each item, check it off against the
packing list, as well as against the following
checklists provided in the
Installation and
Configuration Task List
(555-7101-210):
“CallPilot software media and documentation
checklist”
“CallPilot server hardware checklist”
Summary of Contents for CallPilot 1005r
Page 6: ...Standard 1 06 6 CallPilot ...
Page 8: ...8 CallPilot Publication history Standard 1 06 ...
Page 10: ...Task List Standard 1 06 10 CallPilot ...
Page 12: ...Contents Standard 1 06 12 CallPilot ...
Page 34: ...1005r server description Standard 1 06 34 CallPilot ...
Page 58: ...Installing the server and peripheral devices Standard 1 06 58 CallPilot ...
Page 72: ...Index Standard 1 06 72 CallPilot ...
Page 73: ......