708910B
(Replaces 708910A)
Specifi cations and illustrations subject to change
without notice or incurring obligations.
Printed in U.S.A. (07/09)
O’Fallon, MO
¢708910«¤
708910B
INSTALLATION/PERFORMANCE CHECK LIST
ELECTRICAL SYSTEM:
Electrical connections tight?
YES
NO
Line voltage polarity correct?
YES
NO
Supply Voltage: ______________________ VOLTS
Has the thermostat been
calibrated?
YES
NO
Is the thermostat level?
YES
NO
Is the heat anticipator setting
correct?
YES
NO
GAS SYSTEM:
Gas Type: (circle one)
Natural
Gas
Propane
Gas pipe connections leak
tested?
YES
NO
Gas Line Pressure: __________________ (in - W.C.)
Is there adequate fresh
air supply for combustion
and ventilation?
YES
NO
Installation Altitude: ____________________ (FT.)
Deration Percentage: ___________________ (%)
Furnace Input: _______________________ (Btuh)
Supply Air Temperature: ________________ (° F)
Return Air Temperature: ________________ (° F)
Temperature Rise: ____________________ (° F)
VENTING SYSTEM:
Vent free from restrictions?
YES
NO
Filter(s) secured in place?
YES
NO
Filter(s) clean?
YES
NO
Flue connections tight?
YES
NO
Is there proper draft?
YES
NO
INSTALLER NAME:
CITY _______________
STATE _____________
INSTALLATION ADDRESS:
CITY _______________
STATE _____________
UNIT MODEL #
UNIT SERIAL # ____________________________
Minimum clearances per
Table 1 (page 5)?
YES
NO
Has the owner’s information
been reviewed with the
home-owner?
YES
NO
Has the literature package
b e e n l e f t n e a r t h e
furnace?
YES
NO
Summary of Contents for G7XA Series
Page 2: ...2...