Repair
7-1
Part 1611362
−
01
E
2018 Nordson Corporation
Section 7
Repair
WARNING:
Allow only qualified personnel to perform the following tasks.
Follow the safety instructions in this document and all other related
documentation.
For repair procedures related to the transfer pump, refer to he
Prodigy High
Capacity HDLV Pump
manual.
VT Inline Powder Feed Pump
Pump Removal
1. Shut off the spray guns.
2. Release the clamp handles (8) by lifting them upward.
3. Disconnect the hose from the throat holder (5).
4. Remove the clamp bar (4).
5. Wiggle and pull the pump (6) to remove it from the manifold block (7).
NOTE:
When disconnecting before a purge, the powder port must be
cleaned before replacing the pump.
Pump Installation
NOTE:
For best results, the powder feed hose should be no longer than
10.7 m (35 ft) and rise vertically over its length no more than 3.7 m (12 ft).
1. Align the pump ports.
2. Push the pump (6) into the manifold block (7) until the pump body
bottoms out against the manifold block.
3. Connect the hose to the pump (6).
4. Align the clamp bar (4) with the locating pins and secure on the
manifold block (7).
Summary of Contents for Spectrum VT Feed Center
Page 4: ...Change Record ii Part 1611362 01 E 2018 Nordson Corporation...
Page 8: ...Table of Contents vi Part 1611362 01 E 2018 Nordson Corporation...
Page 12: ...Safety 1 4 Part 1611362 01 E 2018 Nordson Corporation...
Page 24: ...Description 2 12 Part 1611362 01 E 2018 Nordson Corporation...
Page 52: ...Operation 4 24 Part 1611362 01 E 2018 Nordson Corporation...
Page 64: ...Troubleshooting 6 10 Part 1611362 01 E 2018 Nordson Corporation...
Page 86: ...Repair 7 22 Part 1611362 01 E 2018 Nordson Corporation...
Page 100: ...Diagrams 9 2 Part 1611362 01 E 2018 Nordson Corporation...
Page 101: ......
Page 102: ......
Page 103: ......
Page 104: ......
Page 105: ......