Operation
4-10
Part 1611362
−
01
E
2018 Nordson Corporation
Prepare for Hopper Purge
The system will begin to purge the automatic spray guns.
1. Remove the pick-up tube from the box and blow it off.
2. Place the pick-up tube in the holder.
3. Move the powder box onto the vibratory table beneath the hopper.
4. Select the check mark when the spray guns are purged and the
previous steps are completed.
NOTE:
Long pick-up tubes are used in conjunction with a Nordson
drum unloader or other third party bulk unloading systems. Short
pick-up tubes are intended for use with boxes of powder or other user
supplied bins on the integrated vibratory table. For a drum unloader,
remove both pick-up tubes, blow them off, and secure them in their
respective holders. Then, a customer-supplied bin should be placed on
the vibratory table beneath the hopper.
Figure 4-7
Prepare for Hopper Purge
Summary of Contents for Spectrum VT Feed Center
Page 4: ...Change Record ii Part 1611362 01 E 2018 Nordson Corporation...
Page 8: ...Table of Contents vi Part 1611362 01 E 2018 Nordson Corporation...
Page 12: ...Safety 1 4 Part 1611362 01 E 2018 Nordson Corporation...
Page 24: ...Description 2 12 Part 1611362 01 E 2018 Nordson Corporation...
Page 52: ...Operation 4 24 Part 1611362 01 E 2018 Nordson Corporation...
Page 64: ...Troubleshooting 6 10 Part 1611362 01 E 2018 Nordson Corporation...
Page 86: ...Repair 7 22 Part 1611362 01 E 2018 Nordson Corporation...
Page 100: ...Diagrams 9 2 Part 1611362 01 E 2018 Nordson Corporation...
Page 101: ......
Page 102: ......
Page 103: ......
Page 104: ......
Page 105: ......