Powder Pilot
™ HD
P/No.7192721_02
Page | 41
Step 3
–
drain the hopper:
When this screen is shown, the dump valve on bottom of the hopper will be opened and powder is
released into the box below it.
As soon as the low level probe is uncovered, a timer starts to count down for a time to be set up during
configuration.
After it that the
- button appears on the screen to bring the operator to the next step.