System Setup
3-10
Part 1604858-01
E
2013 Nordson Corporation
Pump Connections
1. See Figures 3-4 or 3-6. Connect 8-mm black flow and blue atomizing air
tubing to the gun controller connectors.
2. Route the tubing to the powder pumps. Bundle the tubing with spiral-cut
tubing and protect it from damage and kinking.
3. See Figure 3-9. Connect the air tubing to the pump fittings.
4. Connect the powder hose to the pump throat holders.
Blue 8-mm Tubing
(Atomizing AIr
)
Black 8-mm Tubing
(Flow Air)
Powder Hose
Encore
In-line Pump
Quick-Disconnect
Couplings
Encore
90 Degree
Pump
Powder Hose
Figure 3-9
Pump Connections
Controller Configuration
Power Up Sequence
When power is applied to the system, the controller goes through the
following sequence:
1. All displays and LEDs light for 3 seconds.
2. The main control board configuration is displayed on the KV/
μ
A panel:
A
: Auto
H
: Manual
3. The controller software version, then the hardware version, are
displayed on the KV/
μ
A panel in the form N.NN for 1 second each.
Controller Automatic/Manual Configuration
See Figure 3-5. Jumper JP1 on the Gun Main Control board must be placed
in the AUTO position in order for it to function properly with automatic spray
guns. If it is in the MAN position the guns cannot be triggered remotely.
Refer to Troubleshooting to change the jumper position.
Summary of Contents for Encore LT Automatic
Page 4: ...Change Record ii Part 1604858 01 E 2013 Nordson Corporation...
Page 8: ...Table of Contents vi Part 1604858 01 E 2013 Nordson Corporation...
Page 12: ...Safety 1 4 Part 1604858 01 E 2013 Nordson Corporation...
Page 20: ...Description 2 8 Part 1604858 01 E 2013 Nordson Corporation...
Page 34: ...System Setup 3 14 Part 1604858 01 E 2013 Nordson Corporation...
Page 44: ...Operation 4 10 Part 1604858 01 E 2013 Nordson Corporation...
Page 63: ...Wiring Diagrams 7 1 Part 1604858 01 E 2013 Nordson Corporation Section 7 Wiring Diagrams...
Page 64: ...Wiring Diagrams 7 2 Part 1604858 01 E 2013 Nordson Corporation...