Installation
3-1
E
1996 Nordson Corporation
All rights reserved
108 390B
Issued 7/96
Manual 10-10
Installation
WARNING:
Allow only qualified personnel to perform the
following tasks. Observe and follow the safety instructions in
this document and all other related documentation.
Installation procedures vary, depending on the following factors:
S
where the coating material is charged, either
-
inside the unit, or
-
at the gun
S
how the power supply is controlled if coating material is charged
inside the unit, either
-
with a pressure switch activated by the air signal from the flow
sensor, or
-
with a flow switch in the atomizing air line
S
how atomizing air pressure is regulated, either
-
at the spray device, or
-
with a separate regulator installed either inside or outside the
cabinet
1. Introduction
Summary of Contents for Compact Manual Iso-Flo Voltage-Block
Page 5: ...E 1995 Nordson Corporation All rights reserved Issued 11 95 A1EN 03 SF LIQD 1 Section 1 Safety...
Page 6: ...Safety 1 0 E 1995 Nordson Corporation All rights reserved Issued 11 95 A1EN 03 SF LIQD 1...
Page 20: ...Safety 1 14 E 1995 Nordson Corporation All rights reserved Issued 11 95 A1EN 03 SF LIQD 1...
Page 42: ...Operation 4 0 E 1996 Nordson Corporation All rights reserved 108 390B Issued 7 96 Manual 10 10...
Page 50: ...Operation 4 8 E 1996 Nordson Corporation All rights reserved 108 390B Issued 7 96 Manual 10 10...
Page 58: ...Repair 6 0 E 1996 Nordson Corporation All rights reserved 108 390B Issued 7 96 Manual 10 10...
Page 62: ...Parts 7 0 E 1996 Nordson Corporation All rights reserved 108 390B Issued 7 96 Manual 10 10...