Component keys
Operation
4-25
Part 1107600_03
2014
Nordson Corporation
To adjust the setpoint temperature using the global‐by‐component
method
1. Press and hold the
Hose
or
Gun
key for three seconds.
The left display indicates the number of the first sequential hose or
gun. The right display indicates the current setpoint temperature of the
hose or the gun.
2. Scroll the left display to 0.
The right display indicates all dashes (‐ ‐ ‐ ‐).
3. Press the
Enter
key.
The right display flashes.
4. Use the keypad to enter the setpoint temperature recommended by
the manufacturer of the hot melt. Refer to the technical data
sheet provided by the manufacturer of the hot melt to determine the
optimal setpoint temperature.
NOTE:
If the keypad or the right‐display scroll keys have no affect on the
right display, the melter is password protected. You must enter a valid
password before you can change setpoint temperatures. Refer to
Entering the Melter Password
later in this section.
5. Press the
Enter
key.
The hoses or the guns begin to heat or cool to their new
setpoint temperature.
Summary of Contents for AltaBlueA4TP
Page 8: ...Table of Contents vi Part 1107600_03 2014 Nordson Corporation...
Page 20: ...Safety 1 12 2014 Nordson Corporation Issued 10 11...
Page 31: ...Installation 3 3 Part 1107600_03 2014 Nordson Corporation This page intentionally left blank...
Page 39: ...Installation 3 11 Part 1107600_03 2014 Nordson Corporation This page intentionally left blank...
Page 46: ...Installation 3 18 Part 1107600_03 2014 Nordson Corporation This page intentionally left blank...
Page 60: ...Installation 3 32 Part 1107600_03 2014 Nordson Corporation This page intentionally left blank...
Page 64: ...Installation 3 36 Part 1107600_03 2014 Nordson Corporation This page intentionally left blank...
Page 74: ...Installation 3 46 Part 1107600_03 2014 Nordson Corporation...
Page 108: ...Operation 4 34 Part 1107600_03 2014 Nordson Corporation...
Page 122: ...Maintenance 5 14 Part 1107600_03 2014 Nordson Corporation...
Page 150: ...Troubleshooting 6 28 Part 1107600_03 2014 Nordson Corporation...
Page 152: ...Troubleshooting 6 30 Part 1107600_03 2014 Nordson Corporation...
Page 154: ...Troubleshooting 6 32 Part 1107600_03 2014 Nordson Corporation...
Page 156: ...Troubleshooting 6 34 Part 1107600_03 2014 Nordson Corporation...
Page 158: ...Troubleshooting 6 36 Part 1107600_03 2014 Nordson Corporation...
Page 160: ...Troubleshooting 6 38 Part 1107600_03 2014 Nordson Corporation...
Page 162: ...Troubleshooting 6 40 Part 1107600_03 2014 Nordson Corporation...
Page 164: ...Troubleshooting 6 42 Part 1107600_03 2014 Nordson Corporation...
Page 166: ...Troubleshooting 6 44 Part 1107600_03 2014 Nordson Corporation...
Page 168: ...Troubleshooting 6 46 Part 1107600_03 2014 Nordson Corporation...
Page 170: ...Troubleshooting 6 48 Part 1107600_03 2014 Nordson Corporation...
Page 199: ...Parts 7 21 Part 1107600_03 2014 Nordson Corporation This page intentionally left blank...
Page 216: ...Parts 7 38 Part 1107600_03 2014 Nordson Corporation...
Page 221: ...Technical Data 8 5 Part 1107600_03 2014 Nordson Corporation Figure 8 3 Wiring diagram 1 of 12...
Page 222: ...Technical Data 8 6 Part 1107600_03 2014 Nordson Corporation Figure 8 4 Wiring diagram 2 of 12...
Page 223: ...Technical Data 8 7 Part 1107600_03 2014 Nordson Corporation Figure 8 5 Wiring diagram 3 of 12...
Page 224: ...Technical Data 8 8 Part 1107600_03 2014 Nordson Corporation Figure 8 6 Wiring diagram 4 of 12...
Page 225: ...Technical Data 8 9 Part 1107600_03 2014 Nordson Corporation Figure 8 7 Wiring diagram 5 of 12...
Page 226: ...Technical Data 8 10 Part 1107600_03 2014 Nordson Corporation Figure 8 8 Wiring diagram 6 of 12...
Page 227: ...Technical Data 8 11 Part 1107600_03 2014 Nordson Corporation Figure 8 9 Wiring diagram 7 of 12...
Page 236: ...Calculating Melter Power Requirements A 4 Part 1107600_03 2014 Nordson Corporation...
Page 274: ...Melter Communications C 12 Part 1107600_03 2014 Nordson Corporation...
Page 276: ......