2-2 MAR 2016 49457610 TRIPP HD RevB
LOGOUT/TAGOUT
7. Completely bleed down the air system by pulling
on the air drain cords
located near the right rear of
the machine. See Figure 2-1.
Figure 2-1
8. Bleed off the hydraulic pressure to the component
system under repair.
9. Follow all of your company’s Lockout/Tagout rules
before proceeding.
SAFETY SECURITY
WARNING
MOVING HAZARD! When working on
machine components, be aware that
moving components during repairs may
create energy (ie., moving a hydraulic
cylinder). Take proper precautions. Follow
your company’s Lockout/Tagout policies.
LOCKOUT/TAGOUT PROCEDURES
Nordco has provided the means to
Lockout/Tagout
this machine.
IMPORTANT
Nordco cannot be held responsible for injury caused by
failure to comply with your company’s Lockout/Tagout
Procedures. ONLY qualified and trained personnel are
to install Logout/Tagout devices on this machine.
The following procedures are designed to lead the
operator through the steps required to shut the
machine down and prepare it for performing
mechanical maintenance work. These procedures are
intended to release potentially dangerous stored
energy and make the machine safe to begin repairs.
It is your company’s responsibility to use appropriate
Lockout/Tagout Procedures
based on the included
list and train their personnel in proper and safe use,
and also to periodically inspect your work area to verify
that you are complying with the procedures.
IMPORTANT
Lockout/Tagout Procedures must be followed at all
times!
Summary of Contents for TRIPP HD
Page 6: ......
Page 10: ...Contents 4 MAR 2016 49457607 HD TRIPP RevB TABLE OF CONTENTS...
Page 18: ...1 8 MAR 2016 49457607 TRIPP HD RevB SAFETY INSTRUCTIONS AND INFORMATION...
Page 26: ...3 4 MAR 2016 49457610 TRIPP HD RevB LOCKUPS...
Page 32: ...4 6 MAR 2016 49457610 TRIPP HD RevB GENERAL MACHINE SPECIFICATIONS...
Page 52: ...5 20 MAR 2016 49457610 TRIPP HD RevB OPERATOR SYSTEM FAMILIARIZATION...
Page 60: ...7 2 MAR 2016 49457610 TRIPP HD RevB ROUTINE MAINTENANCE Figure 7 1 RAIL CLAMP LUBE CHART...
Page 62: ...7 4 MAR 2016 49457610 TRIPP HD RevB ROUTINE MAINTENANCE Figure 7 3 TIE EXCHANGER LUBE CHART...
Page 82: ...7 24 MAR 2016 49457610 TRIPP HD RevB ROUTINE MAINTENANCE...