20 | EN
࿈
elero GmbH
3. Connect the drive cable to the four-pole screw
terminal of the control module using the original
connection. The sense of rotation of the drive can
be adjusted by exchanging the cables at the UP and
DOWN terminals.
4. Connect the mains supply to the two spring clamps
on the control module.
5. Insert the eight-pin connection cable to the control
module.
6. Insert the battery pack and the control module into
the installation box. Pay attention to the cable routing
and avoid putting pressure on the components.
7. Connect the battery pack to the control module using
the plug connection.
4.7 Commissioning
The battery pack is delivered in power-saving mode
with a low charge level to prevent it from giving o
ff
any
energy initially. ExitSafe is not ready for operation in this
state. In order to be fully operational, the battery pack
must
fi
rst be charged.
Procedure for commissioning the ExitSafe:
1. First carry out the installation steps described in
Chapter 4.6 Connection and assembly.
2. Switch on the ExitSafe power supply. After a few
minutes, the battery pack starts to charge via the
control module.
3. Wait eight hours.
4. Check the sense of rotation of the drive.
5. Check all connected command initiators and control
elements.