
Component positions
Boiler
1
2
3
4
5
6
7
8
9
10
15
16
17
18
19
20
21
14
13
12
11
List of components boiler
Flue pipe connection, Ø133 mm ext.
1
Sweeping mechanism
2
Air channels (smoke gas)
3
Smoke gas turbulators
4
Hearth
5
Soot box
6
Ceramic insert
7
Ash box
8
Burner
9
10 A miniature circuit breaker (MCB)
10
Soot hatch
11
Expansion connection or supply line (G25)
12
Control computer
13
Main switch
14
Lead-in for electrical cable to burner
15
Inspection glass to check burner flame
16
Hatch for combustion chamber with ash box
17
Flow line (G25)
18
Lead-in channel Ø26 mm.
19
Return line (G25)
20
Drain connection (G15)
21
PELLUX 100
62
For the Installer
Component positions