
Setting the control computer
Before you can use the boiler for the first time, certain
values must be set and certain functions must be started.
E.g. the supply temperature sensor must be activated and
temperatures for the supply line set etc.
Menu
Step
33.3
12:05
05
12:0
TURNED OFF
Tu
OFF
1.
In the start menu, press Enter to open the extended menu.
Central heating
2.
When the extended menu opens, the central heating menu
appears first, press Enter to open the menu.
20:54
Circuit No: 1
Kitchen
C.H. Select
3.
Scroll using the Up and Down arrows until the correct section
appears in the menu.
4.
Press Enter to access the menu for the selected section.
20:54
SERVICE
CH 1
5.
Using the Up and Down arrows scroll to the service menu.
6.
Click Enter to open the service menu, see instructions on page
23 for logging in.
PELLUX 100
20
For the Installer
Installing the boiler