1 Standard Unit Installation Guide
1.1 Important – Please read carefully prior to installation
1. Though this UPS is designed for easy Plug-and-Play installation, it is advisable to engage
qualified Electrical Engineer or trained technical personnel to commission or repair the UPS.
2. This UPS is equipped with an EMI filter. To prevent potential leakage current hazard, ensure that
the AC main supply is securely grounded.
3. To prevent any overheating of the UPS, keep all ventilation openings free from obstruction, and
do not place anything on top of the UPS. Keep the UPS rear panel 30 cm away from the wall or
other obstructions.
4. This UPS is designed to be installed and commissioned in a sheltered, controlled environment as
follows:
- Operating temperature 0-40°C and 30-90% non-condensing humidity
- Always avoid contact with direct sunlight
5. The UPS internal battery should be recharged every 2-3 months if not in use to prevent battery
self-discharge. The battery can be recharged when the UPS is connected to the utility supplì.
6. Always switch off the UPS and disconnect the batteries when relocating the UPS.
7. Please ensure that the input voltage of the UPS matches the utility supply voltage. Use a certified
input power cable with the correct plugs and sockets for the appropriate voltage system.
8. CAUTION -The Warranty of the UPS will be rendered void and the manufacturer reserves the
right to refuse replacement/compensation under the following conditions:
- Accidental damage to the UPS
- Installing the UPS in inflammable or hazardous environment.
- Improper installation or maintenance by unauthorised personnel
1.2 Storage Instruction
For extended storage in moderate climate, the batteries should be charged for 12 hours every 3
months interval by connecting the UPS to the utility supply and switch on input breaker located at
UPS rear panel. Repeat this procedure every 2 months if the storage ambient temperature is above
30°C.
Summary of Contents for 1000-3000VA
Page 13: ...4 3 Tower Configuration Setup Step 1 Step 2...
Page 14: ...Step 3 Step 4...
Page 15: ...4 4 Rack Mount Configuration Setup Step 3 Step 4 Step 5...
Page 16: ...Step 6 Step 7...
Page 19: ...4 5 6 Battery Replacement Step 1 Step 2 Step 3...
Page 20: ...Step 4...
Page 38: ...10 3 3 Installation Instructions Tower installation Stand alone unit Step 1 Step 2...
Page 39: ...Use with UPS Step 1 Step 2...
Page 40: ...10 3 4 Rack Mount installation Step 1 Step 2...
Page 41: ...Step 3 Step 4...
Page 42: ...Second Battery First Battery Bank UPS Connect DC Cable...
Page 44: ...Step 3 Step 4 10 3 7 Specifications...
Page 46: ...11 Technical Specifications...