10.3 Chapter 3: Installation and Operation
Note: The packing condition and the external outlook of the unit should be inspected carefully
before installation. Retain the packing material for future use.
10.3.1 Unpacking
1. Take the battery bank out of the PE foam.
2. Remove the packing materials.
Note: The battery bank module is approx. 12.5~50 kgs, be cautious when unpacking and lifting
the unit to avoid injury
3. Standard Package includes User's Manual
4. Accessories for Tower and Rack Mount
Summary of Contents for 1000-3000VA
Page 13: ...4 3 Tower Configuration Setup Step 1 Step 2...
Page 14: ...Step 3 Step 4...
Page 15: ...4 4 Rack Mount Configuration Setup Step 3 Step 4 Step 5...
Page 16: ...Step 6 Step 7...
Page 19: ...4 5 6 Battery Replacement Step 1 Step 2 Step 3...
Page 20: ...Step 4...
Page 38: ...10 3 3 Installation Instructions Tower installation Stand alone unit Step 1 Step 2...
Page 39: ...Use with UPS Step 1 Step 2...
Page 40: ...10 3 4 Rack Mount installation Step 1 Step 2...
Page 41: ...Step 3 Step 4...
Page 42: ...Second Battery First Battery Bank UPS Connect DC Cable...
Page 44: ...Step 3 Step 4 10 3 7 Specifications...
Page 46: ...11 Technical Specifications...