MX100E SIP-ISDN Gateway Series User Manual
www.newrocktech.com 4-1
4
Powering up the Gateway
4.1 Verification before Power-up
4.1.1 Checking Appearance
This is a review process of the installation work, including the chassis, wiring, connectors, ports, labels
and site as described in the subsections.
Gateway
Check whether there is adequate clearance around the gateway for thermal, and whether the
workbench or rack for the mounting of the gateway is firm enough.
Check whether the gateway is correctly connected to the configuration terminal and other devices.
Cable
Check whether the Ethernet cable, the T1/E1 cables are connected properly.
Check whether the grounding cable is connected properly.
Check whether the power cord is connected to the proper power supply as required.
Port and Connector
Check whether the ports and connectors are secured.
Equipment Room
Check whether the temperature and humidity in the equipment room are within the proper range. The
humidity should be kept at 10% to 90% non-condensing and the temperature should be kept at 0-40
℃
.
4.1.2 Checking Power Supply
Check whether the power supply is in normal operation with a multimeter.
4.1.3 Powering up the Gateway
Turn the power switch to ON position. Check the status of PWR LED, and if it is lit the gateway is
powered properly.