MX100E SIP-ISDN Gateway Series User Manual
New Rock Technologies, Inc. 3-5
3.3.6 Verifying Installation
Installation verification is extremely important, because operations of the gateway depend on its stability,
grounding, and power supply.
Each time you turn on the power during the installation, verify that:
Enough clearance has been reserved around the ventilation openings of the gateway and the
workbench/rack is stable enough.
The protection ground is connected properly.
Proper power is used as specified.
The gateway is correctly connected to console terminal and other devices.