- 98 -
www.New-Leader.com
(800) 363-1771
314732-AA-B
NL5258G5/NL5300G5
Header
9. Measure the height of the actual feedgate opening
from the conveyor as shown by measurement C.
C
10. Enter the measured height of the feedgate
opening into the display. Press
to continue.
11. Repeat steps 2 - 10 for all installed feedgates.
Controller Operations