
5 - WORKING OPERATIONS
13. Release the park brake and back up the tractor until
the sub-frame is beneath the backhoe.
14. Apply the park brake.
15. Raise the stabilizers until the backhoe pins are fully
seated in the sub-frame saddle.
16. Operate the boom control handle to lower the boom
and apply pressure to the floor. This will push the
backhoe against the sub-frame.
NHIL17CT00559AA
6
17. Insert a M30 lock pin
(1)
on each side of the backhoe
as shown in figures
and
NHIL17CT00560AA
7
NHIL17CT00561AA
8
18. Fold the boom and dipperstick.
19. Engage the boom lock.
20. Raise the stabilizers.
21. Engage the stabilizer locks.
22. Backhoe mounting is complete.
NHIL17CT00553AA
9
5-15
Summary of Contents for 905GBL
Page 4: ......
Page 34: ...3 CONTROLS AND INSTRUMENTS 3 4 ...
Page 42: ...4 TRANSPORT OPERATIONS 4 8 ...
Page 58: ...5 WORKING OPERATIONS 5 16 ...
Page 70: ...6 MAINTENANCE 6 12 ...
Page 74: ...7 TROUBLESHOOTING 7 4 ...
Page 83: ......