Page 90/ 191
-
Make sure the total cable length of original instal new installation does not exceed
100 meters.
-
If the mounting of the TRON 40VDR requires a long outdoor cable, it is recommended to
put the cable in a separate steel pipe, which is welded to the ship hull. This will protect the
wire against RF signals interfering with the VDR signals.
-
Before final relocation it is advised to do a test with a flying cable to ensure proper
functioning of the TRON 40VDR.
-
It is critical to choose a position where the released EPIRB will not get trapped by
overhangs, rigging, antennas and so forth, in case the vessel will sink.
-
The EPIRB is supplied with an instruction plate that should be mounted next to the EPIRB
so that is easily visible in an emergency.
-
The EPIRB must be installed in the vicinity of the navigation bridge, i.e. on the wings of the
navigation bridge. Access via vertical ladder should not be accepted.
-
Since the mounting location is critical for the performance of the TRON 4VDR, please find
below screenshots out from the TRON 40VDR Installation manual (revision J).
Summary of Contents for NW6000
Page 1: ......
Page 91: ...Page 91 191...
Page 92: ...Page 92 191...
Page 120: ...Page 120 191 Figure 17 4 2 Connection figure Digital Module 16 channels...
Page 121: ...Page 121 191 Figure 17 4 3 Connection figure Digital Module 24 channels...
Page 125: ...Page 125 191 Figure 18 4 2 Connection figure Analogue Module 8 channels...
Page 126: ...Page 126 191 Figure 18 4 3 Connection figure Analogue Module 12 channels...
Page 184: ...Page 184 191 Figure 5 8 1 Sample dataset playback...