Step 4 – Gr
o
und the system
Each BDM-300X2 has an integrated ground protec
�
on circuit. The grounding
wire is through the trunk cable, and should be securely connected to the ground
connector in the junc
�
on box.
Step 5 – Gr
o
und the system thr
o
ugh racking (
o
p
�o
n)
BDM-300X2 may also be grounded through the racking as shown below.
Step 6 – C
o
mplete the c
o
nnec
�o
n map and c
o
nnect the PV M
o
dules
BDM-300X2 connec
�
on Map is a diagramma
�
c representa
�
on of the physical
loca
�
on of each BDM-300X2 in your PV installa
�
on. The virtual array in NEP micro
inverter gateway BDG-256 is created from the map you create.
C
o
mplete the c
o
nnec
�o
n map
Each BDM-300X2 has a removable serial number label located on the moun
�
ng
plate. Enter this serial number into the BDG-256, and correspond it to a number in
the connec
�
on map.
C
o
nnect the PV M
o
dules
Completely install all BDM-300X2 and all system inter-wiring connec
�
ons prior to
installing the PV modules.
1. Mount the PV modules above their corresponding BDM-300X2. Each BDM-300X2
comes with two oppositely sexed DC connectors.
2. First connect the posi
�v
e DC wire from the PV module to the nega
�
vely marked
DC connector (male pin) of the BDM-300X2. Then connect the nega
�
ve DC wire
from the PV module to the positively marked DC connector (female socket) of the
BDM-300X2. Repeat for all remaining PV modules using one BDM-300X2 for each
module.
09
08