![neno LEADX Ultra Assembly And Operating Instructions Manual Download Page 57](http://html1.mh-extra.com/html/neno/leadx-ultra/leadx-ultra_assembly-and-operating-instructions-manual_3953456057.webp)
NENO LEADX Ultra Manual
© NENO-CNC Schweiz 2023
Seite | 57
4.0 X-axis
4.1 C-beam and HGR rail
4.1.1 HGR rail preparation
Article Nr.
Description
NUMBER FOR MACHINE
X-AXIS LENGTH
1000MM
1500MM
1
HGR 15 rail
2
2
2
M4 x 14mm cylinder head bolt with
hexagon socket
34
52
3
M4 sliding T-nut
2
2
Insert the M4 x 14mm cylinder screw through the HGR rail and screw the M4 T-nut to the other end.
Half a turn on a screw is sufficient. We will tighten them later.
Repeat this process for both HGR 15 rails of the X-axis.
Please note that the number of M4 x 14mm cylinder head bolts and M4 T-nuts depends on the
machine size you have.