Issue 2.0
5-4
SV9100 IP K-CCIS
1.4.1
Hot Swap
The GPZ-IPLE is not hot swappable and cannot be removed from the
GCD-CP10 without first powering down the chassis and removing the
GCD-CP10.
1.4.2
Connectors
The GPZ-IPLE has the following connectors:
CN1 - RJ-45 Gigabit Ethernet LAN Interface
CN3 - Connects to the GCD-CP10
1.4.3
Ethernet Status (IPLE)
Four LEDs (two red, one green and one yellow) on the GPZ-IPLE indicate
Ethernet connection status. The yellow LED is on when the Ethernet link is
up. The green LED flashes to indicate activity and the two red LEDs are
solid to indicate 10 Base-T/100 Base-TX or 1000 Base-T link speed.
1.4.4
Environmental Conditions
Temperature: +32 to 104 degrees Fahrenheit
Humidity: 10% ~ 90% (noncondensing)
Cable length of Ethernet cable: Up to 100m
1.4.5
Installation Procedure
Perform the following steps to install a GPZ-IPLE on the GCD-CP10:
1.
Turn off the system power.
2.
Remove the GCD-CP10, and install the GPZ-IPLE on it.
3.
Insert the GCD-CP10 in slot 1 in the Controlling Chassis.
4.
Figure 5-3 GCD-CP10 Blade with Daughter Board
Installed
Connect the GPZ-IPLE to the CD-RTB or to an
external switching hub using an ethernet cable. Refer to the
UNIVERGE SV9100 Programming Manual for detailed
programming instructions.
1.4.6
Switch Settings
The daughter board has no switches to set.
WARNING
Do not remove or install the GCD-CP10 with the power on.
Summary of Contents for Univerge SV9100
Page 1: ...Networking Manual A50 035910 004 AU Issue 2 0...
Page 20: ...xviii Table of Contents Issue 2 0...
Page 26: ...xxiv List of Figures Issue 2 0...
Page 33: ...Book 1 SV9100 K CCIS...
Page 49: ...Issue 2 0 1 16 General Information US Only Figure 1 15 Circuit Identification Codes CIC...
Page 53: ...Issue 2 0 1 20 General Information US Only...
Page 61: ...Issue 2 0 2 8 Hardware Installation US Only...
Page 195: ...Issue 2 0 4 116 Features and Specifications...
Page 242: ...Book 2 SV9100 IP Networking...
Page 256: ...Issue 2 0 2 12 IP Networking...
Page 312: ...Issue 2 0 4 48 Programming...
Page 376: ...Issue 2 0 6 30 SIP Trunking...
Page 391: ...Issue 2 0 7 14 H 323 Trunking...
Page 467: ...Issue 2 0 8 76 IP Multiline Station SIP...
Page 551: ...Issue 2 0 10 64 SV9100 NetLink Conditions None Feature Cross Reference None...
Page 567: ...Issue 2 0 10 80 SV9100 NetLink Conditions None Feature Cross Reference None...
Page 579: ...Issue 2 0 11 6 NAPT...
Page 580: ...Issue 2 0 SV9100 Networking Manual 11 7...
Page 581: ...Issue 2 0 11 8 NAPT...
Page 582: ...Issue 2 0 SV9100 Networking Manual 11 9...
Page 583: ...Issue 2 0 11 10 NAPT...
Page 584: ...Issue 2 0 SV9100 Networking Manual 11 11...
Page 595: ...Issue 2 0 12 4 All DSP Busy Indication...
Page 671: ...Issue 2 0 13 76 AspireNet Conditions None Feature Cross Reference None...
Page 685: ...Issue 2 0 13 90 AspireNet Department Calling Flexible System Numbering Intercom...
Page 707: ...Issue 2 0 13 112 AspireNet Default Trunk Port Number Name 1 Line 001 2 Line 002 400 Line 400...
Page 713: ...Issue 2 0 13 118 AspireNet Department Calling...
Page 765: ...Issue 2 0 13 170 AspireNet...