D-24
4. Installing Unit on Sun StorEdge Rack
NOTE:
To install the unit on the Sun StorEdge rack, the
NF9100-SK02E rack-mount kit is to be separately purchased.
Ask your sales representative for details.
4.1 Installation of Rails
1.
Temporarily tighten two set screws (#10-32UNF) at both ends of the front frame that
corresponds to the unit installation location. (Do not tighten the screws firmly.)
Set screw