NEC PASOLINK installation procedure
January 2002
Equipment and Materials list
This list depending on the following conditions:
1-
All sites will use one antenna configuration;
2-
The equipment and materials for one site one direction only.
Equipment list:
1-
Antenna
2-
Hybrid.
3- Two ODU’s
3-
Brackets
4-
IF cable
5-
Connectors of the IF cable.
6-
RD unit.(or suitable interface panel)
7-
One IDU.
8-
2M cables and connectors
9-
The power and grounding cables.
10-
The installation materials
Check the frequency plan and the link calculation for the antenna
diameter
Check if the ODU’s low or high frequency according to the
frequency plan.
For the antenna and the hybrid
Prepare the required length of the IF cable
Prepare four pieces of that connector
Depending on, how many cables? how long? What is
the required input impedance ? according to the
system capacity and the impedance is 75 or 120
Polts, nuts, tiewrap, terminals, tap, rupper tap….etc.
Summary of Contents for PASOLINK
Page 1: ...DIGITAL MICROWAVE RADIO SYSTEM PASOLINK Training Course ...
Page 16: ......
Page 17: ...B 1 1 IDU ...
Page 18: ......
Page 68: ...Pasolink Digital microwave radio system Installation guide ...
Page 81: ...NEC PASOLINK installation procedure January 2002 ...