NEC PASOLINK installation procedure
January 2002
Preparation work
Preparation work is that work done before going to install any site.
That work include the following steps:
Notes:
1-
The preparation work can be done for site by site or for all sites depending on company schedule
And resources.
2-
The next page include a detailed list of the equipment and materials to be sorted for each site.
Packing list check
During the packing list check, we shall determine which
case include which items (materials)
Equipment and
Materials Sorting
Sorting means assignment of equipment and materials
to each site.
Equipment and
materials delivery to
site
The delivery to site should be by safe way, by care
persons, and up to shelter or top of the building.
Summary of Contents for PASOLINK
Page 1: ...DIGITAL MICROWAVE RADIO SYSTEM PASOLINK Training Course ...
Page 16: ......
Page 17: ...B 1 1 IDU ...
Page 18: ......
Page 68: ...Pasolink Digital microwave radio system Installation guide ...
Page 81: ...NEC PASOLINK installation procedure January 2002 ...