![background image](http://html.mh-extra.com/html/nec/neax-1000-ivs/neax-1000-ivs_system-manual_251362054.webp)
CHAPTER 3 NDA-24219
Page 40
Revision 2.0
NAP-200-003
Sheet 11/12
Installation of Main Equipment
(2) When the system is two PIM configuration, unplug the PWR CNT CA-A and connect the PWR CNT CA-
C as shown in
Figure 003-8 PWR CNT CA-C Cable Connection between PIMs
LTC CONNECTOR AREA
PIM1
BWB (Back Wiring Board)
PZ-PW86/
PWR0B
PWR0A
PWR1
CARD SLOT AREA
PWR0C
PWR CNT CA-C
PZ-PW112
SIG
(CN103)
LTC CONNECTOR AREA
PIM0
BWB (Back Wiring Board)
PZ-PW86/
PWR0B
PWR0A
PWR1
CARD SLOT AREA
PWR0C
PZ-PW112
SIG
(CN103)
PWR CNT CA-C