NDA-24219 CHAPTER
3
Page 35
Revision 2.0
NAP-200-003
Sheet 6/12
Installation of Main Equipment
2.
19-INCH RACK-MOUNTING INSTALLATION
(1) When the system is two PIM configuration, connect PIMs with three bolts as shown in Figure 003-1.
(2) Before mounting the PIM, connect the TOP COVER, BOTTOM COVER and AC CORD-A-U to the PIM
as shown in
(3) Secure the 19” BRACKET (H) to the 19-inch Rack as shown in
(4) Mount the PIM on the 19” BRACKET (H) as shown in
.
Then, secure the PIM to the 19” BRACKET (H) as shown in
.
Figure 003-5 Mounting PIM to 19-Inch Rack
A
A
B
PIM
19” BRACKET(H)
C
FRONT
19” BRACKET(H)
19-INCH RACK (IEC)
PIM
BOTTOM COVER