NEC IT Series
Issue 1
NEC IT3510/IT2510 Operations Manual
1 - 39
3. Insert a quantity of paper into the cassette, being careful not to exceed the
maximum load. This maximum is indicated by a mark on the paper guide.
4. Push the paper cassette back into the machine.
Figure 1-30 Loading the Paper Cassette
Figure 1-31 Pushing In the Paper Cassette
Maximum paper
load indication
Summary of Contents for IT2510
Page 1: ...N E C I T 3 5 1 0 I T 2 5 1 0 O P E R A T I O N S M A N U A L Issue 1 ...
Page 2: ......
Page 3: ...Operations Manual NEC America Inc Document Solutions CC49001 Issue 1 NEC IT3510 IT2510 ...
Page 4: ......
Page 6: ......
Page 28: ...22 Regulatory and Safety Information Issue 1 NEC IT Series THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 42: ...Issue 1 NEC IT Series xiv List of Figures THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 44: ...Issue 1 NEC IT Series xvi List of Tables THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 122: ...1 78 Getting Started Issue 1 NEC IT Series THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 194: ...2 72 Copy Operations Issue 1 NEC IT Series THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 424: ...7 18 Reports and Lists Issue 1 NEC IT Series THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 464: ...A 4 Glossary of Terms Issue 1 NEC IT Series THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 466: ......