Index-1
A
Air Conditioning, 2-9
cooling capacity, 2-9
B
Blank Panels
installing, 5-17
C
Cable Restrictions
RAID, 3-3
Cable Summary, 3-2
Cabling Constraints, 3-2
Concentrator
installing, 5-14
Concentrator Cable Lengths, 3-3
Configuration Assistant, 1-2
E
Electrical Facilities, 2-10
Environmental Conditions, 2-4
Equipment Location
equipment, 2-2
F
Field Replaceable Units, 6-3
G
Grounding Requirements, 2-11
I
Illustrated Parts Breakdown, 6-1
K
Keyboard Tray
installing, 5-13
M
Monitor
connecting.
Monitor Tray
installing.
O
Options, 6-5
P
Power Distribution Unit
installing, 5-12
requirements, 2-10
R
Rack
configuration guidelines, 3-6
floor requirements, 2-5
leveling, 4-7
opening doors, 4-5
space requirements, 2-2
spacing components, 3-3
unpacking, 4-3
Rack Components
installing, 5-3
Rack Frame Link Kits
installing, 4-8
Rack Stabilizer
installing, 4-10
S
Server
master and protected, 5-10
Side Panels
removing, 4-6
System
configuring, 4-10
System Rack Models
Rack Models, 1-2
System Rack Placement, 2-7
System Rack, 42U, 1-3
System Rack, Multi-Bay, 1-5
T
Typical Configuration, 5-2
U
Uninterruptible Power Source (UPS, 2-10
UPS
installing, 5-4
interface expander accessory, 5-6
load calculation and battery run time, 3-8
Index
Summary of Contents for EXPRESS800
Page 1: ...S e r v i c e G u i d e EXPRESS5800 System Rack...
Page 2: ...xxx...
Page 3: ...S e r v i c e G u i d e EXPRESS5800 System Rack...
Page 16: ......
Page 28: ......
Page 32: ...3 4 Planning Your System Rack Configuration Figure 3 1 Mounting Hole Arrangement within a Rack...
Page 42: ...4 4 Installing the System Rack Figure 4 1 Rack Mounted on Shipping Pallet...
Page 68: ......
Page 69: ...6 Illustrated Parts Breakdown Field Replaceable Units Options...
Page 74: ......
Page 76: ......
Page 77: ...xx...
Page 78: ...456 01544 000...